[ 03 / Scheduled Maintenance ]
When a robot loses a servo, the whole line stops. With a preventive maintenance schedule we handle lubrication, calibration, brake and belt replacement in advance — reducing annual downtime by ~70%.
[ SCOPE ]
1 visit / year
Single robot, low-volume lines
2 visits / year
2-5 robot mid-volume lines
4 visits / year
5+ robots, 24/7 production
We visit your site and recommend a package based on robot count and production intensity.
[ DİĞER HİZMETLER ]